XRG has a proven track record of success, with zero process or emissions warranty claims to date.

XRG recently replaced a natural draft, vertical cylindrical (VC) heater in reboiler service at a refinery located in Utah, USA.
XRG was contracted to evaluate options to eliminate flame impingement on a Charge Heater for a refinery in the mid-western U.S.


XRG provided crucial engineering expertise in the scale-up of a client’s unique patented gasification process for its first full-scale commercial implementation at a greenfield waste-to-energy plant in Oregon.
XRG provided a turnkey revamp of a large crude heater in The Netherlands to solve flame impingement problems, increase heater capacity and improve fuel efficiency.


XRG provided an engineering study, equipment supply, and installation services to revamp an ammonia heater in Iowa.
XRG recently retrofitted a convection section in a crude heater that was originally built in 1935. The new convection bank consists of two sections; the lower half is used to preheat the crude while the upper section is used to generate superheated steam.


XRG was selected to design and supply the new cold air bypass duct for the air preheater (APH) unit of a twin cell heater at a Texas refinery.
XRG was selected to revamp existing heaters in a Gulf Coast refinery by installing new radiant tubes, new burners, a new stack damper and the implementation of updated instrumentation.


XRG Technologies
1855 E 15th Street
Tulsa, OK 74104
info@xrgtechnologies.com
+1 918-201-2656